Amandoot metro station

अमंडूत (तळोजा) मेट्रो स्थानक

Station 19 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.

No ground photo yet

Dated photos of Amandoot from the street will appear here.

Where

19.07599, 73.09068 (approximate, from the 2019 project report)

See it on the mapOpenStreetMap (opens in a new tab)

UnverifiedMMRDA DPR (2019) (opens source in a new tab)

Along the line

20.5 km along the 2019 alignment (DPR chainage 20,492.296 m)

Next stations
  • Towards Kalyan: Pisarve
  • Amandoot is the last station, at the Taloja end.
Interchange

Navi Mumbai Metro Line 1

VerifiedMMRDA (opens source in a new tab)

Around the station
Construction

Under construction (civil works across the corridor)

MMRDA publishes corridor-wide progress only, not per-station progress.

ReportedMMRDA (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.

Sources conflictFree Press Journal (opens source in a new tab)

Line 12 status and opening date, answered

Name

Amandoot (the 2019 project report calls it Taloja)

Called 'Taloja' in the DPR. DPR text gives ch. 20,525.676 m; the station table gives 20,492.296 m. The table value is used.

ReportedThe Metro Rail Guy (opens source in a new tab)

In Marathi: अमंडूत (तळोजा)

Reportedloksatta.com (opens source in a new tab)