Line 12

Mumbai Metro, Kalyan to Taloja. The unofficial tracker.

Edition of Facts checked Not affiliated with MMRDA

Kalyan metro station

कल्याण मेट्रो स्थानक

Station 1 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.

No ground photo yet

Dated photos of Kalyan from the street will appear here.

Where

19.23867, 73.12736 (supplied by the site owner, 28 Sep 2026)

See it on the mapOpenStreetMap (opens in a new tab)

Reported

Next stations
  • Towards Taloja: APMC Kalyan
  • Kalyan is the first station, at the Kalyan end.
Interchange

Metro Line 5 (Thane-Bhiwandi-Kalyan)

VerifiedMMRDA (opens source in a new tab)

Construction

Under construction (civil works across the corridor)

MMRDA publishes corridor-wide progress only, not per-station progress.

ReportedMMRDA (opens source in a new tab)

When it opens

No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.

Sources conflictFree Press Journal (opens source in a new tab)

Line 12 status and opening date, answered

Name

Kalyan

Not in the 2019 DPR. Added to Line 12 scope in civil contract CA-240. Rail Analysis (Dec 2025) reports a foot overbridge link to Central Railway at Kalyan Junction. Loksatta (27 Sep 2026) lists Kalyan first among the 19 stations.

ReportedThe Metro Rail Guy (opens source in a new tab)

In Marathi: कल्याण

Reportedloksatta.com (opens source in a new tab)

Facts checked . All 19 stationsThe full Line 12 tracker