Pisarve Depot metro station
पिसारवे डेपो मेट्रो स्थानक
Station 17 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.
No ground photo yet
Dated photos of Pisarve Depot from the street will appear here.
- Where
19.10488, 73.08948 (approximate, from the 2019 project report)
- Along the line
17.2 km along the 2019 alignment (DPR chainage 17,176.971 m)
- Interchange
None announced
- Around the station
- In Turbhe village near a pond; named for the DPR depot site, which later moved to NiljeVerifiedMMRDA DPR (2019) (opens source in a new tab)
- Construction
Under construction (civil works across the corridor)
MMRDA publishes corridor-wide progress only, not per-station progress.
- When it opens
No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.
Sources conflictFree Press Journal (opens source in a new tab)
- Name
Pisarve Depot
The name comes from the DPR depot plan. The depot is now at Nilje, so the name may change.
ReportedThe Metro Rail Guy (opens source in a new tab)
In Marathi: पिसारवे डेपो
Facts checked . All 19 stationsThe full Line 12 tracker