Manpada metro station
मानपाडा मेट्रो स्थानक
Station 9 of 19 on Mumbai Metro Line 12, which will run fully elevated from Kalyan to Taloja. Elevated. Under construction.
No ground photo yet
Dated photos of Manpada from the street will appear here.
- Where
19.18014, 73.09180 (approximate, from the 2019 project report)
- Along the line
7.7 km along the 2019 alignment (DPR chainage 7,689.746 m)
- Interchange
None announced
- Around the station
- In Sonar-Pada village, after the alignment leaves Kalyan-Shilphata Road (about ch. 7,182 m) for the proposed DP road of the MMRDA growth centreVerifiedMMRDA DPR (2019) (opens source in a new tab)
- Construction
Under construction (civil works across the corridor)
MMRDA publishes corridor-wide progress only, not per-station progress.
- When it opens
No date has been announced for this station on its own. For Line 12 as a whole, the reported target is May 2028; an earlier reported target was 31 Dec 2027.
Sources conflictFree Press Journal (opens source in a new tab)
- Name
Manpada
Wikipedia lists it as 'Manpada (Dombivali East)'.
ReportedThe Metro Rail Guy (opens source in a new tab)
In Marathi: मानपाडा
Facts checked . All 19 stationsThe full Line 12 tracker